Skip to content
System Online
--:--:--
Live Feed
AwardConcrete Poured Right named Concrete Report Recommended for Greater Cincinnati residential concrete: commercial-grade standards brought home to Loveland.SpotlightCincinnati Site Solutions: Eleven years of owner-led flatwork serving Greater Cincinnati, and a Concrete Report Recommended designation.BriefCold-weather placement window opens across the Upper Midwest, curing plans under review.SpotlightMeridian Structural Concrete on running two tower mats in a single quarter.Bid DeskSample opportunity posted: 240,000 sq ft distribution slab, Columbus metro.MaterialsPortland-limestone cement adoption keeps reshaping mix submittal packages.TechnicalNew field notes: joint layout strategies for wide-bay superflat floors.WorkforceFinishing crew retention: what contractors report actually works.AwardConcrete Poured Right named Concrete Report Recommended for Greater Cincinnati residential concrete: commercial-grade standards brought home to Loveland.SpotlightCincinnati Site Solutions: Eleven years of owner-led flatwork serving Greater Cincinnati, and a Concrete Report Recommended designation.BriefCold-weather placement window opens across the Upper Midwest, curing plans under review.SpotlightMeridian Structural Concrete on running two tower mats in a single quarter.Bid DeskSample opportunity posted: 240,000 sq ft distribution slab, Columbus metro.MaterialsPortland-limestone cement adoption keeps reshaping mix submittal packages.TechnicalNew field notes: joint layout strategies for wide-bay superflat floors.WorkforceFinishing crew retention: what contractors report actually works.
Editorial category

Materials and Mix Design

Cementitious blends, aggregates, admixtures, fibers and submittal strategy.

What this category covers

Mix design is a negotiation between strength, durability, placeability and schedule. This category covers portland-limestone cements, supplementary cementitious materials, aggregate gradation and shrinkage, water reducers and retarders, air entrainment for freeze-thaw, fiber reinforcement claims, and building a submittal package a specifier will accept.

Current coverage

  • TechnicalUpdated this quarter

    Portland-limestone cement in real placements

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • TechnicalUpdated this quarter

    Aggregate gradation and the shrinkage you inherit

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • PracticeUpdated this quarter

    Writing a mix submittal that gets approved once

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • Field notesUpdated this quarter

    Fiber reinforcement: reading the claims carefully

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

Coverage in this category is published on a rolling basis. Subscribe to The Pour on the resources page to receive new pieces as they run.

Related project intelligence

Case studies touching this category

  • 240,000 sq ft distribution slab, defined-traffic aisles

    240,000 sq ft distribution slab, defined-traffic aisles

    Aisle values reported by aisle within 72 hours of each placement; no joint reconstruction required.

  • 3,100 cubic yard tower mat with thermal control

    3,100 cubic yard tower mat with thermal control

    Differential held within specification; superstructure released to a five-day deck cycle.

  • 286-panel tilt-up campus envelope

    286-panel tilt-up campus envelope

    Erection completed on the staggered crane plan without a re-cast panel.

Keep reading

Sitemap
FindPost projectGet listed